Page 20 - FOSMA Beacon Issue 3
P. 20

FOSMA / BEACON / Jan 2023








      We have installed the IGF Simulator at FOSMA            Course  includes  PC  Based  Simulator  for  LNG

      Institute at NOIDA and have recruited qualified          Fuel  Bunkering  approved  by  DNV-GL.  It
      faculty for this course. FMIRO has commenced            includes an integrated Automation System for
      the IGF Course from January 2023. This course           LNG  and  Dual  fuel  systems  integrating  all
      provides  the  knowledge  and  skills  to  the          significant data into a single platform The IAS

      officers  and  personnel  responsible  for  the          allows  the  operator  to  go  through  LNG
      care,  use  of  the  fuel,  or  in  an  emergency,      bunkering  process.  The  Power  Management
      adequate response to the fuel and fuel system           System  in  the  simulator  allows  all  the

      on  board  ships  subject  to  the  International       standard  functions,  such  as  load  dependent
      Code of Safety for Ships using Gases or other           start,  stop,  load  sharing,  synchronizing,  and
      Low-flashpoint Fuels (lGF Code). During the 5-           load  shedding.  The  Alarm  and  Monitoring
      day  course  candidates  acquire  below                 System  allows  the  operator  to  control  all

      mentioned important skills required for safe            propulsion  system  equipment  parameters.
      operation  in  handling  Low  flash  point  fuels        Emergency (ESD) operating procedures can be
      aboard ships subject to IGF code                        trained by fault simulation and scenario editor

                                                              mode. The main purpose of the simulator is the
      Ÿ Familiarity  with  physical  and  chemical            practical preparation of the trainee for the LNG
          properties of low flash point fuels                  fuel  bunkering  operations,  and  more

      Ÿ Operate  controls  of  fuel  related  to              particularly:
          propulsion plant and engineering systems
          and services and safety devices.                    Ÿ  LNG bunkering and related safeties.

      Ÿ Safely perform and monitor all operations             Ÿ Tank  preparation  for  LNG  fuel  bunkering
      Ÿ Plan and monitor safe bunkering, stowage                  including inerting, gassing up and Cooling
          and securing of the IGF fuel                            down procedures.
      Ÿ Take precautions to prevent pollution from            Ÿ Fuel Gas Supply System for preparation and

          the release of IGF fuels                                delivery to Engine Room.
      Ÿ Monitor  and  control  compliance  with               Ÿ Tank pressure management.
          legislative requirements.                           Ÿ Familiarization  with  the  engine  room

      Ÿ Take precautions to prevent hazards                       installation and safe features
      Ÿ Apply  occupational  health  and  safety              Ÿ Acknowledgment  with  diesel  generators,
          precautions and measures                                thrusters and auxiliary equipment starting

      Ÿ Prevention,  control  and  fire-fighting  and               procedure
          extinguishing systems.                              Ÿ Power management system operation.
   15   16   17   18   19   20   21   22   23   24   25